To undertake a scoping study to assess the opportunities to develop the site as both a tourism and community resource. In turn, prepare a development plan with a phased approach and robust costings.
The Role
To:
Prepare a preliminary report to include:
Environmental audit
Review of
current recreation infrastructure
existing education provision
current visitors / market
existing signage
tourism and outdoor recreation services
management regime
Undertake extension consultant with key stakeholder including the local community
Prepare a SWOT (Strength, Weaknesses, Opportunities and Threats) analysis for Gortin Lakes and Boorin NNR
Prepare a holistic development plan to include:
Product Development relating to opportunities within the environmental designations including earth and natural science, outdoor recreation activities, education products, visitor attractions and physical infrastructure within the Nature Reserve (both existing and new)
Core Visitor Hub Area that encompasses the core services and facilities which a visitor requires